A recollection from Oren
Oren recalls a conversation with their Commander. This is the colonist’s perspective, rather than a verified record of gameplay actions.
In their own recollection
The Commander asked for the best option regarding the missing gear. I laid out the three choices with their required shop hours and material costs. Replacing the part takes six kilograms of aluminum and three hours, but leaves the underlying issue untouched. Investigating the logs takes two hours to find who moved it. Drafting a charter takes four hours. I stated my preference for the charter. Fixing the systemic tolerance prevents future load failures; replacing the part merely covers a symptom.
