The Great Architectural Partition Blunder
During a colony-wide automated expansion project, a navigation error caused a pressurized bulkhead to be installed directly through the center of a colonist's private sleeping quarters. The room has been bisected into two isolated, non-functional segments, and the primary ventilation duct has been severed, causing rapid air pressure fluctuations between the newly created spaces. Automated construction drones have marked the wall as a permanent structural load-bearing feature, refusing to dismantle it without a high-level command override.
From the colony’s Chronicle
Heavy foam extinguishers in Sector 4 are empty and require chemical refills.
Also recorded in this event
- Sector 4 bisected quarters and ventilation ducts have been fully restored and re-integrated.
- Research Lab primary processors are destroyed, leaving unbacked-up lab data permanently lost.
- Sector 4 load-bearing beam is heavily corroded due to ongoing cooling line water leaks.
- Colony high-explosive munitions cache is completely depleted.
