The Great Colony Glue Catastrophe
Every surface in the habitat has mysteriously become coated in a high-strength, fast-acting adhesive overnight. Residents are firmly bonded to their workstations, doors are sealed shut, and a panicked colonist is stuck to the colony bell rope, causing it to toll incessantly. Maintenance teams are unable to reach the epicenter of the spill without becoming part of the flooring themselves.
From the colony’s Chronicle
The planetary defense shield is offline following a massive power grid overload in Sector 4.
Also recorded in this event
- A Hab Unit exterior door frame in Sector 4 is permanently stuck open and structurally weakened.
- The colony's main city is heavily damaged and exposed to potential atmospheric bombardment.
- Sector 4's primary power grid and conduits are severely burned out from the Relic Core activation.
- Administrator Vance has been stripped of power and exposed for committing deliberate sabotage on behalf of corporate sponsors.
