Chronicle event
The Great Plaza Indoor Swimming Hole
An automated drainage system designed to protect the colony infrastructure was incorrectly calibrated, directing all excess exterior runoff into the…
- Sub-Level 2 telemetric arrays suffer from permanent saltwater damage following the flood breach.
- The geological substrate beneath the margin bedrock is undergoing rapid decay and structural destabilization.
- Auxiliary substations in multiple sectors are degraded with ongoing voltage brownouts.
+ 2 more facts recorded

