Chronicle event
The Great Neon Pink Oversight
The entire exterior of the main research hub has been mistakenly coated in industrial-grade, neon pink paint that refuses to be stripped or covered…
- The compound is secured behind locked blast doors with a welded hydraulic arm latch
- Primary distribution relays in Sectors 3 and 4 are shattered, causing localized blackouts
- Heavy slag centrifuges have been permanently converted into sonic defense emitters
+ 2 more facts recorded

